Installation & Surface Requirements

Installation & Surface

  • Can be installed on: concrete, screed, or leveled subfloor

  • Requires full-surface adhesive or high-quality double-sided tape for temporary setups

  • For sled use, a firm, flat substrate is recommended

  • Installation should be carried out by a professional installer or flooring contractor

Care & Maintenance

  • Vacuum or brush regularly to remove dust and chalk

  • Spot clean with mild soap and water when needed

  • Avoid dragging heavy sharp-edged equipment directly on the surface

  • Indoor use recommended for maximum lifespan and color stability